The plaintiff filed a claim for damage as a result of Hurricane Ian. It claimed damages were over $24 million, but the carrier accepted partial coverage and paid $8,307.49 for secondary components. The carrier found hurricane damage to the building, but it was below the insurance policy’s $3.6 million deductible. The plaintiff sued for breach of the insurance policy.

The carrier argued in a motion for summary judgment that plaintiff could not recover replacement cost value (RCV) because the property repairs had not been effectuated. The policy provided for RCV, but only after the repairs were completed. The carrier argued that because the repairs were not completed, the plaintiff was not entitled to RCV damages. The plaintiff argued the carrier could not withhold the actual cost value (ACV) due, which was the main allegation of the lawsuit, then fault it for not making the repairs to unlock the RCV.

The United States District Court for the Middle District of Florida rejected the carrier’s argument, finding that when an insurer allegedly breached the policy by withholding coverage, it could not hide behind a repair-contingent provision to block the insured from RCV damages at trial. The court found the issue to be whether the contractual language designed to preclude certain coverage until after repairs are completed barred an insured from seeking those damages at trial when repairs were not complete.

The court noted the Eleventh Circuit had not resolved this issue and neither side pointed to a definitive answer from the Florida Supreme Court. The court reasoned that it must look to the Sixth District Court of Appeal (6th DCA), which is the court which would have heard this case if it was in state court. The court noted the 6th DCA recently addressed this issue in Universal Prop. & Cas. Ins. Co. v. Rodriguez, 427 So. 3d 676 (Fla. 6th DCA 2026). The Rodriguez Court found that a breach of contract action is designed to adjudicate not only whether the contract was breached, but also evaluate the damages incurred had the breach not occurred, which the Rodriguez court found to be recovery of the RCV.

This court also noted basic Florida contract principles compelled the same result, as a material breach frees the nonbreaching party to suspend its own performance and can demand the full benefit of its bargain, including RCV damages. Finally, the court found the distinction between a full denial and partial denial did not compel a different result. It found the policy required the carrier to acknowledge coverage and pay ACV for all covered damages, and the failure to do that is a material breach, entitling the insured to all of the damages available.


Riva Del Lago Condominium Association, Inc. v. Steadfast Insurance Company; Case No. 2:24-cv-1056-KCD-KRH; Middle District Fla. July 7, 2026.

COURT RULING